Projects
What we have done so far. Lots of exciting project coming up.
  • Featured Articles

    Pioneering the use of Hydra-Slide’s innovative sliding method featured in major industrial news online! (Click image to learn more)

    Yu Sin Engineering Uses a Hydra-Slide HT300 to Move Boring Machine for Singapore Tunnel Project

     

    See the operation in action! (Original Link)

     

    Giving back to the society during our low-key periods. (Click image for more info)

    23 men volunteer to cook for a cause